Template:RESTRICTEDAREAThe Benton Rail Operations Centre (affectionately known as the Benton ROC) was a building that was used to control the signals around the network. As of SCR Version 1.1 the building is now defunct, as the Signalling ROC was moved to Stepford East.
History
- The Benton ROC was added back in early January 2018, along with the upgraded Benton and Angel Pass.
- Back then, most of the floors were empty, except for the display of the front car of the Class 700 on the first floor.
- In The Big Update, the signalling room was added, making this the place were the signallers signal the whole network at.
- In Ver 1.1, they removed the Class 700, the equipment in the signalling room and allowed everyone to go through the barriers on the first floor.
Floor Layout
First Floor | Entrance with barriers; no longer restricted |
Second Floor | Empty signal control room with no equipment and some empty rooms; Nobody can enter |
Third Floor | Charlie_RBX, Thehazard9, and BanTech's offices |
Uses
- This was the place where the Signallers do their signalling at. The old signalling room was at Coxly, but after V1.1 The control room got moved again to Stepford East Rail Operations Centre.
- The entrance of the building was used as a gathering place for attendants of Dispatcher trainings and many other events. They were soon relocated to the Stepford East ROC.